Road Works & Closures
Road Closed Sign photo
Any upcoming road works or closures

that effect the parish will be shown below.
All roadwork and closure details may also be found on one.network
and www.wiltshire.gov.uk/highways-road-closures

~*~*~*~

Road Closure to the Main Street Through the Village
on Wednesday 27th September
Road closure C154 on 27.09.23

Section 14(1) of the Road Traffic Regulation Act 1984
Temporary Closure of: C154 (Part), Kington St Michael (Ref: TTRO 8952) 
Notice is hereby given that the Wiltshire Council has made an Order to close temporarily to all traffic: 
C154 (Part), Kington St Michael; from its junction with Allington Lane to its junction with Grove Lane.
To enable: Openreach to carry out replacement of carriageway frame and cover and 
associated works.
Alternative route: via C154 (unaffected length) – C178 – C86 – B4039 – C153 and vice versa.
The closure and diversion route will be clearly indicated by traffic signs. 
This Order will come into operation on 27th September 2023 and the closure will be required
between the hours of 9am and 3pm for 1 day.
It is anticipated that the works will take the stated duration to complete depending upon weather conditions.
Access will be maintained for residents and businesses where possible, although delays are likely due to the nature of the works.
The Order will have a maximum duration of 18 months.
The closure can also be found on one.network here: https://one.network/?tm=135172945
For further information please contact Ferns Group on behalf of Openreach on 
01732 442210.

~*~*~*~

Road Closure from KSM to Yatton Keynell down Grove Lane
on 13th November for 3 Days


Road closure KSM to YK 13.11.23

Wiltshire Council 
Section 14(1) of the Road Traffic Regulation Act 1984
Temporary Closure of: C172 (Part), Kington St Michael and Yatton Keynell (Ref: TTRO 
9054) 
Notice is hereby given that the Wiltshire Council has made an Order to close temporarily to 
all traffic: 
C172 (Part), Kington St Michael and Yatton Keynell; from outside its property known as 
Cromhall Farm for a distance of approximately 415m in a south westerly direction.
To enable: Gigaclear to carry out blockage clearance and associated works.
Alternative route: via C172 (unaffected length) – C86 – B4039 – C153 – C154 – C172 
(unaffected length) and vice versa.
The closure and diversion route will be clearly indicated by traffic signs. 
This Order will come into operation on 13th November 2023 and the closure will be required 
for 3 days. It is anticipated that the works will take the stated duration to complete depending 
upon weather conditions. Access will be maintained for residents and businesses where 
possible, although delays are likely due to the nature of the works. The Order will have a 
maximum duration of 18 months. 
For further information please contact Avonline Network Services on behalf of Gigaclear on 
02382 012670.